VORP Thrift Store

VORP Thrift Store
Click the photo to visit the VORP Store on Facebook.
Showing posts with label Garrison Park. Show all posts
Showing posts with label Garrison Park. Show all posts

Monday, January 22, 2018

Plans for Garrison Park Improvements Taking Shape

Progress on the preliminary plans for the improvements to Crossville's Garrison Park has been made and Tammy French, Crossville Parks and Recreation Department Director said that parts of the project will start going out to bid in about 45 days. 

In addition to a large playground and splash pad, the existing basketball court will be resurfaced, sidewalks constructed and a multi-purpose building will be built.  The building will house the pumps for the splash pad, 4 family restrooms and at the front will be a covered picnic pavilion.

Close up of plans for Phase 1 of Garrison Park

In the plan above you can see that there will be a large green space between the playground on the left and the splash pad on the right for play and frisbees and catch.  

French said that the splash pad would be 53 feet wide and 78 feet long with a variety of water structures.  A toddler area will be in one end and items for larger kids and even adults would be part of the installation.  The splash pad feature will use recirculating water that is filtered and treated.  

The playground is designed to be all-inclusive and will measure 60 feet wide and 100 feet long.  It will include swings and a play structure with a variety of activities.  

Plan showing the full park

In addition to oversight by Lose and Associates Engineers and the Tennessee Department of Environment and Conservation, the project will be managed by a general contractor.  The playground and splash pad are expected to be bid separately to firms that specialize in those installations.  Work is expected to continue on the project much of this year. 

Sunday, January 21, 2018

Crossville Council calls special meeting Tuesday January 23 at 5:15 PM

Council Special Called Meeting January 23, 2018, at 5:15 PM

The Crossville City Council has a special called meeting set for Tuesday evening January 23 at 5:15 PM in Council Chambers at Crossville City Hall.  The agenda includes routine items, a grant possibility, and discussion of a citywide hotel/motel tax.

Crossville City Hall


Most of the items on the agenda are routine consent agenda items that the council has acted on before including second reading of an ordinance discouraging smoking at Garrison Park and the ordinance establishing a sports council.

Council will also consider authorizing the application for a $10,000 grant to US Bank for specialized playground equipment as part of the improvements to Garrison Park. The grant is used for musical play items for both developmentally challenged and general population youth. No match is required for this grant.


The main item causing the special call appears to be a discussion on a resolution to the Tennessee General Assembly requesting the state allow Crossville to impose a hotel/motel tax to be earmarked for economic development and tourism funding. The discussion is to be lead by Councilman Danny Wyatt. Currently, there is a county hotel/motel tax authorized here.  

Friday, December 1, 2017

Council Worksession Agenda includes Garrison Park, Recreation Committee and Downtown Parking

The Crossville City Council will meet for their December monthly work session Tuesday, December 5th at 5:00 PM to discuss items including work currently underway at Garrison Park, the formation of a recreation advisory board, and parking needs in Downtown Crossville.

Two agenda items for Garrison Park will discuss a budget for the cost of the demolition currently underway and to declare leftover items such as metal doors surplus so they can be sold.
Demolition of Garrison Park underway

The budget item indicates that city staff thinks the estimate for the removal of the stadium was too low due to the tipping fees for disposal. The city plans to use the block and brick to fill in where the old Meadow Park Lake water treatment plant was located and tipping fees will be paid for wooden material to be disposed of. Some of the bricks will be preserved to create a wall to post photos of the original park when it hosted the professional baseball team. The estimated cost of demolition listed on the agenda item totals $20,000.

Items to be sold as scrap iron include doors, tin roofing and old fencing. The value is expected to be over $2.500.

Also, the possible formation of a Citizen Advisory Board for Parks and Recreation as recommended by the recreation master plan will be discussed. The agenda item on the formation of such a board says, “There have been three meetings to discuss the formation of the committee and its role. As the discussions have progressed, both the excitement and scope have heightened. This can be attributed to several factors. Two of the driving forces have been the high quality of facilities already established in the City and also the amount of untapped potential there is in the City and surrounding County. This has led the group to an understanding that it needs to reach beyond just the involvement of recreation activities, but the need to encompass support functions including the accommodations and food service community.”

Additional information provided to the council states, “The group sees their role as a promoter of the City and County to support existing opportunities, but also to step out and potentially add new opportunities. They see a need for a central clearinghouse to make sure tournaments and other events do not conflict with those in the City and County, or other activities nearby that could impact the success of our events. They would work with accommodation providers to assure that good deals were offered, rooms filled, and incentives provided to allow us to compete with other communities.

Membership structure of this committee is envisioned as interested community leaders, with support and input from City, County, and State Park staff as needed. The group also feels there needs to be representation from each of the following formal and informal groups: Lake Commission, Trails Community, Shooting Sports Park, Hotel-Motel Industry, Convention and Visitors Bureau, and several members from the community-at-large who can represent interests including, golf, basketball, softball/baseball, soccer, agritourism, flag football, etc.”

After looking at the remainder of the old handle mill property near downtown as possible parking, the city engineering staff has studied some other properties as potential parking locations for downtown. The study looked at the assessed value versus the number of spaces that could be added and the cost per space ranges from a high of almost $5000 per space down to just under $1000 per space. These costs are only estimated not including any site preparation costs or the fair market value of the property but simply a way to compare possible solutions.

Potential locations for downtown Crossville parking


Other items on the work session agenda include discussion of an application for a Community Wildlife Habitat program, change the version of building and energy conservation codes from 2009 to 2012 as required by the state, discussion on the contract for signalization of the intersection at West Avenue and Fourth Street.  

Thursday, November 30, 2017

Garrison Field Bleachers Coming Down in Preparation for Park Redevelopment

Bleachers used for Baseball and early County Fair Events
to be replaced by new park attractions.

Crossville city crews have been working this week to begin the process of recreating Garrison Park using state grant funds to improve the centrally located park.

The removal of the 60 year old bleachers has been controversial as some wanted to see the structure saved but because work to improve the bleachers would require upgrades to ADA standards, the city council decided to remove them.

Plans for the park include a picnic area, playground, walking trail, basketball courts and a public restroom facility.  The cost of the park redevelopment totals approximately $1 million with the state grant covering half the cost or $500,000. 

Previous story on Garrison Park history and condition from August 2016

Final design plans for the park are currently being prepared and bids on the project are expected to go out in early Spring 2018. Plans are that the baseball field A will be retained at the park. Original plans called for a multi-purpose field as phase 2 of the park redevelopment. 

Garrison Park gate File Photo


Saturday, July 15, 2017

Crossville Council OKs Garrison Park budget amendment with some members still opposed to grant

The Crossville city council finally approved the third and final reading of a budget amendment needed to approve payment for work already done and paid for as part of the Garrison Park redevelopment project. One council member opposed the measure based on the project requiring that the fence around the park be removed.

The council started second guessing the project after discovering details that had been previously provided to them in agenda materials including that the fence around the park would be removed. The other controversy in the project is the removal of the grandstand built in the late 1940s that is in disrepair and unable to meet ADA requirements for handicapped access.

Prior to the July council meeting, members review the
Garrison Park concept plan.  L-R Pamala Harris,
Mayor James Mayberry, J.H. Graham, city manager Greg Wood
and Scot Shanks.

At this point, the council has approved acceptance of the grant contract from the State of Tennessee for $500,000 in a 50/50 match and has approved contracts with the engineering firm designing the project and the grant administrator in previous actions.

Council discussion on Garrison budget amendment

Some council members then looked at the details of the work and have appeared to want to slow the process until some changes can be made or abandon it all together. The state has told the city the grant agreement requires them do do certain things in order to complete the grant including the removal of the fence and grandstand. The state said that the fence could be put back up completely or partially if the city wants to. According to city manager Greg Wood, the current model for public parks is to have open un-fenced access to the amenities.

The project also includes a splash pad, a playground, new basketball court and restroom facilities at the park.

Councilman J. H. Graham moved to approve the budget amendment at the amount paid for the work and was seconded by Mayor James Mayberry.

Jim Young Reporter is sponsored by

Councilman Danny Wyatt said he would not support the matter “because we've learned a lot of things over the last month or two.” Wyatt complained about having to tear down the chain link fence adding, “The taxpayers paid for this fence and it's in good shape.”

Mr. Graham commented that he only intended for the bills already paid to be covered under the budget and he was “not supporting any contracts or accepting the grant or anything else.”

After some confusion expressed by councilwoman Pamala Harris, city clerk Sally Oglesby explained to the the council that the grant had been accepted and the contracts approved months ago.


Prior to the vote being taken, Mayor Mayberry clarified once more that the vote was strictly on the budget amendment to cover expenses already paid for the previous fiscal year. The motion passed with three aye votes from Graham, Mayberry and councilman Scot Shanks. Council members Wyatt and Harris voted no.  

Friday, July 7, 2017

July City Council agenda covers solid waste contract as well as Garrison Park and downtown Sidewalks

Crossville city council meets for their regular July meeting on Tuesday July 11 and will discuss a budget amendment for Garrison Park improvement work, downtown sidewalks and a possible grant as well as potential industrial expansions.

Meetings start with the council's audit committee meeting at 5:15, the Crossville beer board meeting at 5:45 and the regular agenda meeting starts at 6:00 PM.
L-R Crossville city manager Greg Wood and council members
J.H. Graham, Danny Wyatt, Mayor James Mayberry,
Pamala Harris and Scot Shanks.

After failing to approve the third and final reading of a budget amendment to pay for work already preformed during the 2016-17 fiscal year, council will address the topic again during their regular meeting. The motion by councilman Danny Wyatt approved at the called meeting late last month called for tabling the matter “until someone can tell us why we have to take the fence down.”

Garrison Park

At the called meeting several council members expressed unhappiness with removing the fence and later putting it back up. Mr. Wyatt estimated that cost at around $100,000. The $500,000 state department of environment and conservation grant that the city agreed to requires that the old grandstand and the perimeter fence be removed. The redevelopment plan includes a new water feature splash pad, a playground, replacing the basketball court and constructing a restroom building in the park. The grant requires a $500,000 match from the city.

The city council will look at possible grant funding from the state for downtown sidewalks. The city has talked about improving sidewalks downtown fro some 14 years now but can't seem to get the project underway. The state TDOT grant now called Transportation Alternatives Program. The program was previously known as the Transportation Enhancement Program and was part of the funding in place previously for part of the downtown project. City manager Greg Wood and councilman J. H. Graham will discussion on the grant that can be used for sidewalks and pedestrian lighting.
Tell them you saw it on Jim Young Reporter

Council is expected to act on the the new solid waste collection contract. City manager Wood and street superintendent Kevin Music both recommend the approval. The new 5 year contract reduces the annual cost by some $121,000 annually and the city will take over the leaf and brush collection. The new contract uses the property appraiser's classification for residential and commercial and the question of mobile home parks is answered in the city's ordinance originally passed on 1973 and updated in 1998 requiring that they provide refuse collection in their parks.

CoLinx is asking to lease property next to it's expansion in the Interchange Business Park for parking for additional employees as the parking is not adequate. In addition, the city manager may have additional information on a potential industrial prospect for the community.


Other agenda items include Friends of the Airport memorial and the marketing report.  

Wednesday, July 5, 2017

City council continues to drag feet on Garrison Park re-development project.

While the city's Garrison Park redevelopment project has a signed grant contract with the state, engineers and a grant consultant and work is progressing on design and engineering work, council's action at last weeks called meeting put off passing the third and final reading on a budget amendment funding work that has taken place during the last part of the 2016-17 fiscal year.

So far the council has not canceled the project, the work or the grant but only tabled the approval of a budget amendment pending additional information.
City council called meeting-sitting at table L-R 
Danny Wyatt, Pamala Harris, Mayor James Mayberry
and J. H. Graham

The discussion mainly concerned the fence that is currently surrounding the park that the grant application indicated would be removed. The LPRF (Local Parks and Recreation Fund) has said the fence can be replaced but are holding a position that the current must be removed as it was part of the grant application they approved.

During discussion, councilman J. H. Graham said that his phone calls over the previous two weeks indicated that if the fence had to be removed and field A was lost that his constituents were in favor of discontinuing the renovations until coming up with a better solution. He added that finding a ball park was difficult in the city of Crossville.
Concept for Garrison Park re-development plan

Garrison Park entrance and fence

City manager Greg Wood said that the city would have the use of the ball fields that belong to the local school system at the two high schools if they were needed. It was also clarified that field A was not being removed and was not part of the current grant or renovation plan.

The fence remains the main sticking point as Graham said “I have a real problem with taking down a perfectly good fence and building it back.”

Councilman Danny Wyatt said that there was 4000 feet of chain link in the park that he said was “somewhere in the neighborhood of $100,000. “I'd like for a good level headed person to tell me why you would take a perfectly good fence down and create a safety concern,” commented Wyatt.

Jim Young Reporter is sponsored by

Manager Wood explained that the current trend in parks is to have open access and not have fences all the way around them to encourage access to the park from all sides.

Wyatt said, “I'd like to make a motion to table this until someone can tell us why we have to take the fence down.

Questions arose on the fact that the city has already signed contracts for work done by the engineering firm Lose and Associates and Community Partners for grant administration. City attorney Will Ridley said that the city would have to pay for work that has already been done by the firms if the city were to back out of those contracts.

Questions about whether backing out of the grant would cause the city to be ineligible for additional such recreation grants was also discussed but manager Woods planned to meet with representatives of the city of Livingston for additional clarification on some of the issues since they just completed a similar grant. 

Councilwoman Pamala Harris indicated that the comments that they city could not get another grant didn't make sense to her since grants are usually awarded on a point system.  Said Wood, “If you don't close out one grant then it may be that you are not eligible to get another one.”

Wyatt's motion was approved with 4 votes in favor.


A motion to approve the year end budget amendments was approved by the council with little discussion and a unanimous vote of the council members present. Councilman Scot Shanks was out of town for the meeting.  

Saturday, June 17, 2017

After assurances fence and Field "A" are safe, council moves forward on Garrison Park improvements.

Crossville city council agreed to move forward with the planned redevelopment of Garrison Park while the city plans to keep the perimeter fence around the park and the so called Field “A” intact.

The city received a $500,000 grant toward the project to remove the late 1940's grandstand, put in a playground, a splash pad, a new basketball court and a rest room. The city is to match the state funds for the total cost of $1 million for phase one of the project. It is unclear if or when additional work might be done on the park.
Initial design plan for Garrison Park improvements

The action on the June agenda was a budget amendment for the current fiscal year to move forward with contracts for design and grant administration. Council members Danny Wyatt and Pamala Harris both expressed concern about the need to retain the fence around the park and the larger ball field at the park.
L-R: City manager Geg Wood, council members J.H. Graham
and Danny Wyatt, Mayor James Mayberry and council members
Pamala Harris and Scot Shanks. 

The item was pulled out of the consent agenda for separate action and discussion by councilman J. H. Graham and councilman Danny Wyatt addressed his concerns saying, “I'm all about building this park over there but I want it done correctly.” Wyatt mentioned the fence around the park and said it would be very expensive to replace.

Entrance to Garrison Park

The other item Wyatt sought clarification on is the ability to leave Field A since it is part of the second phase of the project that is not currently funded or under consideration. Wyatt also questioned why if the grandstand was part of Field A was it part of this project.

Mayor James Mayberry responded, “The bleachers were one of the biggest health and safety issues with the whole deal and why it was a priority.”

Councilwoman Pamala Harris said her biggest concern was if there was a guarantee that the city could conserve Field A and conserve the fence. “I'm just uncomfortable unless I know these things can be saved,” added Harris.

Check the great lineup of vehicles at

Mayor Mayberry said that he had a verbal assurance that the state would use common sense about the safety provided by the perfectly good fence and there should be no reason to remove it. Mayberry added that he had been to the Tennessee Municipal League meeting and found out that park designers like to have parks feel more open without fences but that safety is a concern.

Mayberry said that with the removal of the grandstand a backstop fence would be required as well.

Discussion of a possible big tournament in the Fall came up and it was estimated that no work on the field would start before the first of 2018 and the grant funds must be used within 2 years.

Video of council discussion on Garrison Park

With one final reading still to go, the city will request an answer in writing by a special called meeting on June 29th when the final reading is expected to take place along with the final reading of the 2017-18 budget.

With that, Mr. Wyatt made the motion to approve contingent on getting an answer by the third reading and was supported by Mr. Graham and the motion passed unanimously.

The longtime park has been the location of a baseball field since the 1920's according to property records and at one time was the location where the Cumberland County Fair was held.


Monday, May 22, 2017

Council approves moving forward with Garrison Park plans and Centennial Park splash pad.

“I don't know why we wait til the very end on projects and decide to not do them,” commented Crossville Mayor James Mayberry during a discussion of the next steps on the redevelopment of Garrison Park.

“We've already executed the contract,” pointed out Mayberry after councilman Danny Wyatt sought to delay the project with a motion for the city attorney to review the contract and report back to the council at their next meeting. Councilman J. H. Graham seconded Wyatt's motiuon for the purposes of discussion.
Council discussing Garrison Park. L-R J.H. Graham,
Danny Wyatt, Mayor James Mayberry and Scot Shanks

City manager Greg Wood advised the council that the things in the grant would have to be done but there was some flexibility on matters of sidewalks and fencing.

Mayberry stated, “I've got it on pretty good authority they will use common sense in our disucssion request on the fence” and the city has sent a letter in reference to that.

Wyatt said his questions came up “because we wasn't told all this on the front end.” Mayberry said that the city could keep Field A at Garrison Park because the planned “multi-use field” is part of phase 2 of the plan and currently the funding and plans were only for Phase 1.

The motion failed in a tie vote with Wyatt and Graham voting in favor and Mayberry and councilman Scot Shanks opposed.
Council discussion on Garrison Park and
Centennial splash pad.

Mayor Mayberry moved that the city approve the contracts with Community Development Partners, the grant administrator and Lose and Associates, the engineer firm to design the work. Mayberry's motion also included first reading of a necessary budget amendment. Mr. Shanks gave a second for the motion.

With no further discussion, the vote included yes votes from Mayberry and Shanks. Wyatt voted no and Graham abstained. With councilwoman Pamala Harris not yet at the meeting and the abstention counted with the yes votes, the motion was approved.

Council moved then moved to discussion of the addition of a splash pad at Centennial Park to match the one planned for Garrison. Mr. Wyatt moved that the city put out a request for proposals for the design and construction of a splash pad.


Discussion revealed that the council had previously requested Hart Freeland Roberts to prepare a design for such an installation but no contact was ever brought back to the the city. Manager Wood has recommended that the previous action be rescinded and a new request be circulated. Mr Wyatt amended his motion to rescind the previous action.

Manager Wood suggested the city might be able to have to the two splash pads done together and be able to save some money on the work.


Wyatt's motion passed unanimously with yes votes from all four council memebers present. Ms. Harris arrived at the meeting following these actions.  

Tuesday, May 16, 2017

Special Called council meeting Thursday 5 PM on Garrison Park, splash pad and sidewalks. Budget work follows

Crossville city council meets in a called meeting followed by a work session on Thursday starting at 5 PM in Crossville city hall.

The called meeting will include discussions and possible action on at least two items deferred from the regular council meeting last week. One topic is moving forward with the plans to redevelop Garrison Park on Fourth Street and the other is another round of discussion on downtown sidewalks, a topic that has been around since plans were first put forth for downtown improvements 14 years ago.
Garrison Park entrance

The council put off action to move forward and approve contracts for grant administration and engineering for the Garrison Park project until they got a response from the Local Parks and Recreation Fund (LPRF) about keeping the fence around the park and keeping the larger baseball filed known as Field A. Plans remain to remove the old grandstand structure built around 1949 as it is in poor condition and not ADA accessible.

The redevelopment plan for the park includes a splash pad, playground, new restrooms, a walking trail, and redoing the basketball court. The city was awarded a 50/50 match grant of $500,000 for the project.
Example of Splash pad in Cookeville's Dogwood Park

A discussion is also planned on a splash pad proposed for Centennial Park. The project was discussed last year and a motion to have the then interim city manager negotiate a contract with engineers on such a project. No contract was ever brought back before council and current city manager Greg Wood is recommending the council seek a design/build contract on such a project.

Council will hear information about the city manager and engineers recent meeting with TDOT officials on the sidewalk and Main Street paving project. TDOT will correct some of the downtown sidewalk corners to bring them up to ADA standards and current plans are for the city to do the rest. At this point the city hopes to know which corners TDOT will fix.

Deteriorated sidewalks in downtown Crossville

Councilman Scot Shanks has proposed the sidewalks be repaired by bidding the project out, a scenario that is estimated to be a 9 month process versus having city employees do the work, a process that could take 3 years.

Additional items on Thursday's agenda include approving the replacement of the traffic light signal at Lantana Road and Main Street. The project will be paid for 100 percent by funds from Surface Transportation grant funds with no local match required.

And one of the air conditioning units at the Crossville airport has failed and the city is taking bids for its replacement. That action will also come before the council and budgeted funds are available.

Crossville Memorial Airport Terminal Building

Following the called meeting, the council will meet in work session to continue work on the 2017-18 budget.

Visit Park Place Motors today! 


Saturday, May 13, 2017

Garrison Park action delayed until city knows about keeping fence and Field "A"

The tug of war between the new and the past continues to lead to discussion by the Crossville city council and still no decision made yet on the redevelopment of Crossville's Garrison Park on Fourth Street.

The council put off a decision on approving contracts with the grant administrator and engineer until they find out about the possibility of maintaining the current fence around a portion of the park and the long time ball field known as Field A. The grandstand structure is to be removed unless the city refuses to accept the $500,000 grant from the Local Parks and Recreation Fund and turning down the grant could negatively effect the ability of the city to get any future money through that grant program.
Garrison Park as it looks today

Tentative plan for the redeveloped park

The plan to redevelop Garrison Park was originally part of the city recreation master plan developed by Lose and Associates during 2014 and the mater plan was required to be eligible to apply for the grant funds. The grant to Crossville was announced in August 2016 and and the grant requires a 50 percent match. The grant included a splash pad, redoing the basketball court, new restrooms, walking trails, a playground and removing the old grandstand structure as phase 1 of the project.

Crossville resident Vancienetta Wisdom has spoken against removing the grandstand several times and addressed the council during public comment at the start of the May council meeting. She said, “Garrison Park is as much a part of Crossville's history as the Palace Theatre, the depot and the old Cumberland County high school building.” Mrs. Wisdom asked the council to consider keeping A field and using B field for the planned improvements.
City Manager and council discuss Garrison Park improvements

Crossville mayor James Mayberry moved to approve the contracts involved in the project and approve the necessary funds for the current fiscal year, expected to be $25,000. When asked by councilman J. H. Graham to be specific about the parts of the project, Mayberry said that he did not find anything in the documentation that said the fence had to be removed or that anything had to be done to the “A” baseball field. The grant does specifically address the grandstand and it is to be removed as part of the first phase of the redevelopment.

Mayberry's motion was seconded by councilwoman Pamala Harris.

Councilman Danny Wyatt said that an email from city clerk Sally Oglesby indicated the fence and field A had to be removed. City manager Greg Wood said that he would fight to keep the fence based on the amount of traffic on Fourth Street and that it was needed to protect the children. Wyatt said, “I want to know this before I support this.”

Ms. Harris asked Mayor Mayberry if he would accept an amendment that the action was contingent on the keeping of the fence and field A and he agreed to the change in language.

Ms. Harris said that she understood that the topic was emotional to a lot of residents and it was tough to cope with change. She continued that if the fence and field A could be kept that the other improvements would be nice for the park and the community.


Mr. Wyatt again asked about the approving the contracts and a budget amendment before knowing the specifics. City attorney Will Ridley told the council that with the amendment the mayor would not be authorized to sign the agreement without knowing about the two items. After additional brief discussion the motion was deferred, or as Mayor Mayberry said “kicked down the road” until a tentatively special called meeting in the next two weeks.   

New report sponsored by Park Place Motors


Monday, May 8, 2017

Busy Tuesday for council. Discussions incldude sidewalks, Garrison Park and new animal shelter.

Crossville city council holds their regular May meeting Tuesday May 9 with a series of meetings starting at 5 PM.
Crossville city hall

The council will meet as the audit committee at 5 PM in the third floor conference room followed by a public hearing on the city's capital improvement plan at 5:30. Meetings starting with the public hearing will be held in the council chambers on the second floor at city hall. The council will meet as the Beer Board at 5:45 PM and a public hearing at 5:50 PM on the annexation of 6.3 acres at the Gardens. The regular council meeting starts at 6 PM.

Topics up for discussion on the council agenda include another run at the downtown sidewalk project following a lengthy discussion at their work session last week. (Link to story) In addition, council will take up the improvements planned for Garrison Park. The park redevelopment does include the removal of the old grandstand at the park as it does not meet ADA requirements and has other issues.
Vancienetta Wisdom discusses Garrison Park during
city council work session

The redevelopment decision has become a bit controversial and there are some in the community that would like to see the structure saved. Vancienetta Wisdom addressed the issue at council work session last week and talked about the history of the park seeking to convince the council to not tear down the grandstand. Crossville has received a grant to pay for the first phase of the redevelopment and the city has already signed the grant contract for the LPRF (Local Parks and Recreation Fund) money and it could be a problem for the city with future grants if they change their mind on the deal at this late date.
Garrison Park and grandstand

Contracts for the grant administrator and the engineering work must be approved for the grant to move forward.

The city continues to pursue a fuel truck for the Crossville Memorial Airport. The grant would cover half the $35,000 cost with the remainder coming from funds budgeted for the airport.


And council will discuss the request from county mayor Kenny Carey on the new animal shelter building. Carey is asking for the city to waive permit fees and to install sewer line to the location of the new building as well as providing a grinder pump to the project's contractor. The city has previously committed $90,000 toward the project and the cost of the material will come from that amount.


Sunday, April 30, 2017

Council work session Tuesday to talk sidewalks and possible road closing changes.

The Crossville city council meets for their monthly work session Tuesday May 2 at Crossville city hall and will discuss a number of items expected on the regular agenda coming up on May 9. The meeting starts at 5 PM and will be held in the third floor conference room at city hall.

Council plans to discuss downtown sidewalks during the work session once again and will hear from Crossville resident Ed Daszkiewicz who is blind and will discuss with the council what it is like to walk around Crossville.

The City of Crossville gets so many request for road closings for events and 5K races that they are looking at setting a standard 5K route that will reduce the time by city employees and cost to the city. If organizers use that rout there would be no charge but if they choose a different route they would need to reimburse the city for expenses. The council also plans to discuss the possibility of moving the cruise ins and other events to the block behind the courthouse and around the amphitheater.

Council will also discuss action on contracts for the Local Parks and Recreation Fund grant on the redevelopment of Garrison Park. Environmental work has been completed and certified by the state. The contracts under consideration are with the grant administrator Community Development Partners and Lose and Associates for final design and bidding services. The agenda points out that a number of public meetings were held on the project and public hearings on the adoption of the recreation master plan.
Plan for Garrison Park redevelopment

Garrison Park

The lease on the Crossville depot is up for renewal later this year and the city has been notified that the C. A. T. S. group that has operated the depot for the past 3 years will not be renewing or extending the lease. Council will discuss what to do next. The lease expires August 31.

Council will discuss a request from Cumberland Co. mayor Kenneth Carey on the work on the animal shelter. Carey is requesting that the city waive permit fees and city crews install sewer line from the tap to the location of the new building along with providing a grinder pump to the contractor. All material costs would be deducted from the city share of the cost of the building.

Council will discuss the city's capital improvement plan that is required by the charter to be approved by council. A draft of the plan is available on the city website here.




Tuesday, August 16, 2016

Garrison Park Grandstand, brief history and photos of current condition

While there are some efforts to try and save the old grandstand at Garrison park, the structure is not in very good shape with leaks and mold problems, and the city says there are plenty of baseball fields at Centennial Park that are in better shape.

Crossville recreation director Tammie French said that the park would become a community park that would provide activities and play for children in the area and for adults, a walking trail.  The second phase of the project will include a multi purpose field that would allow football and soccer games as well.  French pointed out that the city currently has no football fields in its inventory. 

In 1947, the start of the city of Crossville’s recreation department included approval by the Crossville city commission to approve the financing of the construction of Garrison Park Grandstands. The dream of grandstands had been in the works back into the 1920's when a fund raiser was held at the Mecca. It is not know what happened to any funding raised, but until almost 1950 there was just a baseball field at Garrison Park.

The property at Garrison Park was most likely acquired when the city got the land for the construction of City School on Fourth Street. The city kept ownership of the park when they gave the city school to the county to operate.

From it's construction until the time the Crossville Blues semi-pro baseball team was disbanded in the early 1950's it was their home field. It was a big part of the warm weather entertainment of that time. After the semi-pro team disbanded, the field and grandstands were used for a variety of local teams to play baseball including the Cumberland Co. High School team and it was operated by the city recreation department.

The field was named after Bill Garrison, a local resident who went north to make his fortune in Chicago. He was also known as “Dollar Bill” for the story that he left Crossville with only a dollar in his pocket. When he returned he built the Will-Nell building where Highland Federal is today and the Palace Theatre. He also owned the house on 70-E that was also known as the Oaklawn Country Club.

The story is that he donated money towards the construction and that is the reason the park was named after him. If the city's current plans goes through, the park would remain known as Garrison Park.    

Below are some photos of the current state of the grandstands.  We were able to get access to the space under the grandstands and there are leaks and mold problems currently.

This photo shows an area under the grandstand that is leaking badly.  
This is below both the roof and the concrete seats.

Ladies Restroom

Door frame rusting out

Under the grandstand

Bricks, rust and water under the grandstand

Water coming in causes the white scaling

Concrete damage and rust




The photos below are exterior damage.  It appears that the brick exterior may be of a later date then the original construction.